Sunday, July 31, 2011

Moments from last week (July 17-23)

We had a busy and fun week last week. We finally started getting a little more sun, even though the temperatures were still on the cool side (high 60's & low 70's). Luckily by the weekend we started getting some warmer temps - up in the mid to high 70's.
Our Week was filled with things like
*taking the van in to get maintenance work done on it
* A play date for Lauren with her friend Abi. 
*Doing some Relief Society visits with the other R.S. counselor.  We visited one new sister in the ward and one inactive sister.  We also stopped by three other sisters homes but they weren't home. 
*Kirk and I took two kids (Tyler and Lauren) back to the dentist to get a small cavity filled for each.  While I was at the dentist with the kids, Kirk went and did our big grocery shopping. We combined the trips to save on gas money.
*Friday was our first really nice day weather wise.  The kids and I (except Tyler) went and visited my sister and her kids.  The kids had fun playing together.
*Saturday it was finally warm enough for the kids to play outside in the water.  I think it got up into the low 80's that day.  It was weird to think that it has been such a cool summer here while the rest of the country has been burning up with super hot temperatures.  Our pool was in some serious need of clean up work, after not being used for about three weeks.  Shannon and Whitney used the slip and slide instead.  Unfortunately at the end of their slip-n-sliding, Whitney decided to jump on the end of it (the part that fills with water).  That was the end of the slip-n-slide.  The whole seam split open and it no longer worked.



Kirk and Tyler have spent a lot of time over the last couple of weeks working on a shed they are building to store the bikes and other things out of the garage.  Below are a couple of pictures of their progress so far.  Kirk decided it needed to have a root cellar underneath it to store potatoes and things from the garden in it.  So that has made it a little more complicated process.  He is also building it in a spot where it hangs over the edge of a drop off, so that complicated it a little bit.  It took them a while to get things this far.  It is going to be so nice to have the bikes and other junk out of the garage.
Looking at the lower part (root cellar) of the shed foundation (before the concrete was poured)

Looking at the shed floor while he was still forming it up and putting the re-bar in.  The spot with the wooden box is where the root cellar will be below the floor.  You will access it from the side, which will be above ground.




Posted by Picasa

No comments:

Related Posts with Thumbnails